September 2008.
Despite no update for quite a while, be rest
assured that the project continues apace!
In late September Mr Sharpe made a very
welcome visit to Lancashire to continue with the
difficult rewire of CDK.

We have decided to alter the layout of the
wiring loom to enable much easier access, should
problems occur in the future. So instead of it
all being stuffed to one side of the header
tank, it will now be routed to a water tight box
below the header tank, thus eliminating any need
to remove inner & outer panels should anything
go wrong.
Other jobs which can now be ticked off the
list as it were are:-
1x Brand-new radiator sourced, ordered &
delivered.
2x New shock absorbers and mounting brackets
(now fitted).

All new hoses fitted to water system.
A new air filter system has been sourced.
Springs and shackle pins and kingpins
sourced, money being the only thing holding us
up here on this one!
Rick has meanwhile spent vast amounts of time
making sure that the rear panel is a perfect
fit, with primer now applied and final filling
almost done, we just need to complete the
weather proof of the boot sill area, by fitting
galvanised steel around the boot rail and then
the back can be fitted.

The chassis of CDK is now looking much better
as well. After spending hours cleaning,
degreasing and scrubbing, a liberal coat of grey
resin sealing paint has been applied to areas
now in accessible because of panel refitting. A
few satisfying hours have been spent repairing
the now fully usable spare wheel carrier as as
well.